Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13755110

- Product Categories
- Nanjing no vibration slip r..
- Art Asia-mode Floor
- Nanjing Arts Die floor embo..
- Nanjing cafe antique floor ..
- Epoxy garage floor epoxy mo..
- Nanjing epoxy floor constru..
- Nanjing Nanjing, plastic ru..
- Nanjing garage no vibration..
- Nanjing Fei Hao undertake r..
- Friendly Links
- home > Supply > Nanjing Hao Ping enclave Engineering Co., Ltd. Epoxy garage floor epoxy mortar floor parking lot construction engineering floor anti-static dust floor construction 15,261,451,886
Nanjing Hao Ping enclave Engineering Co., Ltd. Epoxy garage floor epoxy mortar floor parking lot construction engineering floor anti-static dust floor construction 15,261,451,886
Information Name: | Nanjing Hao Ping enclave Engineering Co., Ltd. Epoxy garage floor epoxy mortar floor parking lot construction engineering floor anti-static dust floor construction 15,261,451,886 |
Published: | 2015-05-02 |
Validity: | 30 |
Specifications: | Nanjing Hao Ping enclave Engineering Co., Ltd. to undertake Epoxy construction, epoxy Moshi floor, garage floor construction, epoxy mortar floor, parking floor engineering, corrosion dust-proof anti.. |
Quantity: | 1001.00 |
Price Description: | |
Detailed Product Description: | Epoxy garage floor epoxy mortar floor parking lot construction engineering floor anti-static dust Epoxy Floor construction is a high strength, wear resistance, beautiful floor, with no seams, solid texture, good chemical resistance, easy corrosion, dust, maintenance, low maintenance cost advantages. Construction technology elements to deal with: First, the original ground fully polished, smooth asperities need repair and cleaning, vacuuming, wet place should first drying. Bottom: with a trowel to deploy pure resin material is uniformly good knife to the original ground, and prime completely penetrate the adhesive to form a strong adhesive bottom. Mortar layer: to be the underlying cure before the deployment of a good putty material is applied evenly with quartz sand comprehensive trowel applied Daogua above ground level, to strengthen the floor of the compressive strength, impact resistance. (2mm will paint twice) middle: the mortar layer to be fully cured before sanding, the deployment of a good middle coating material with a trowel flat trowel mortar layer on top, and fill the mortar layer uneven pits and pinholes and uniformly smooth. Surface: to be in the coating after curing cleaned after grinding with grinding machine overall smooth surface of the base coat flat and smooth. After the top coat material formulations stirring with a trowel trowel evenly on top of the coating, the formation of a dust, corrosion, wear, smooth, bright surface self-leveling. Nanjing Hao Ping enclave Engineering Co., Ltd. to undertake Epoxy construction, epoxy Moshi floor, garage floor construction, epoxy mortar floor, parking floor engineering, corrosion dust-proof anti-static floor construction. Phone: 152-6145-1886 |
Admin>>>
You are the 24168 visitor
Copyright © GuangDong ICP No. 10089450, Floor Engineering Co., Ltd. Nanjing Hao enclave All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 24168 visitor
Copyright © GuangDong ICP No. 10089450, Floor Engineering Co., Ltd. Nanjing Hao enclave All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility